Monday, June 22, 2009

Shovel Head

Rode the CB trails for 1.5 hours with about a half hour stop for trail work. Fixed up the dirt transition that was needing to be fixed on a new feature.

Then headed out for the rest of the ride. Found some new features and a new trail to try. One section showed that really need a seat collar QR ASAP. Being able to drop the saddle is a good idea.

Hopefully tomorrow when I go by the shop to pick up what I have left there I can double check the data. Though I will probably go by Cyclepath to confirm some of the numbers.